Skip to content
MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Cookies in Mivare Space
DOCUMENTS / COOKIE POLICY · MGR-LEG-002

Cookies in Mivare Space. Analytics only with your consent.

We describe the cookies we use and how you decide about analytics in the ‘Privacy settings’ window.

YOU ARE IN THE RIGHT PLACE

Cookie policy in six sentences.

This page summarises the ‘Cookie policy’ document for Mivare Space. Below you will find the essentials in plain language. The binding full text is published in one place: the Mivare Group document library.

Version in force: 1.4 · 8 November 2026

Open the full text and PDF

DOCUMENT MGR-LEG-002

Necessary and analytics cookies

The website uses the files it needs to work. We start Google Analytics 4 only after you give your consent, with no advertising or remarketing.

Necessary cookies

mivare_group is a session cookie: it protects the contact form against abuse, stores the confirmation that your message was sent and enables secure document downloads. mivare_zgoda remembers your choice in the consent window for 12 months.

Consent window

On your first visit, the ‘Privacy settings’ window lets you accept all, reject optional cookies or customise your consent. You can change your choice at any time with the ‘Cookie settings’ link in the footer.

Google Analytics

After you consent, Google Analytics 4 (Google Ireland Limited) stores _ga cookies for up to 2 years and keeps the data for up to 14 months. It runs in Consent Mode v2: without your consent, no data is sent to Google.

Withdrawing consent

When you withdraw consent, analytics stops and the _ga cookies are deleted. Necessary cookies remain, because the site does not work properly without them.

You are in control

You can delete and block cookies in your browser settings. Blocking the mivare_group cookie may prevent you from sending the contact form or downloading a document.

WHERE TO FIND THE FULL DOCUMENT

All our legal documents are published at Mivare Group.

Mivare Space is built by Mivare Labs, a brand of Mivare Group. We keep the terms of service, privacy and cookie policies, data processing agreements, payment terms and legal information for all our brands and products in a single library, at permanent addresses, as web pages and PDF files.

Go to the Cookie policy at Mivare Group

ONE LIBRARYONE SOURCE

01

One source

The same current text applies to every brand and every product. There are no versions that drift apart between websites.

Always the current version
02

Web page and PDF

Read the document in your browser or download it as a PDF to keep for your own records.

To read and to keep
03

One company

MIVARE GROUP PROSTA SPÓŁKA AKCYJNA · Registered office: 22-440 Krasnobród · Registry court: Sąd Rejonowy Lublin-Wschód w Lublinie z siedzibą w Świdniku, VI Wydział Gospodarczy KRS · KRS 0001268091 · NIP 9223092251 · REGON 545767254 · Share capital: PLN 1,000. The brands are trading names of a single entity.

You know who you are contracting with