Where the data is
The application, database, files and backups are in the European Union, and backups are kept in a separate store, apart from the server and from the files. We do not transfer entrusted data outside the European Economic Area.
Answers to the questions a company or its adviser asks before choosing an application: where the data is, who has access to it, how it is protected and what happens in the event of a failure.
This page summarises the ‘Security pack’ document for Mivare Space. Below you will find the essentials in plain language. The binding full text is published in one place: the Mivare Group document library.
Version in force: 1.3 · 24 November 2026
Open the full text and PDFDOCUMENT MSP-LEG-007
The application, database, files and backups are in the European Union, and backups are kept in a separate store, apart from the server and from the files. We do not transfer entrusted data outside the European Economic Area.
A company account is logically separated from the others at application and database level, and files are made available only by the application, after permissions are checked. We do not combine the data, do not sell it and do not train artificial intelligence models on it.
We store passwords solely as an Argon2id hash, two-factor authentication (TOTP) is available to every user, and the administrator can require it for everyone. Sign-in attempts are limited, and sign-in is temporarily paused after a series of failed attempts.
Connections are encrypted (TLS), the application encrypts files before writing them and scans every uploaded file with antivirus software. We remove metadata, including location, from photos. Backups are encrypted with a key kept off the server. Encryption of the database on disk is only planned, and we say so plainly.
We back up the database every hour and keep those backups for 7 days, make a full backup once a day and keep it for 3 days, files have a continuous backup, and we test data restores periodically. Planned interruptions longer than 15 minutes are announced at least 72 hours in advance.
We notify the account administrator of a personal data breach within 48 hours at the latest. We answer questions about safeguards within 14 days, and the company or an independent auditor may carry out an audit under the DPA, no more than once every 12 months.
Mivare Space is built by Mivare Labs, a brand of Mivare Group. We keep the terms of service, privacy and cookie policies, data processing agreements, payment terms and legal information for all our brands and products in a single library, at permanent addresses, as web pages and PDF files.
Go to the Security pack at Mivare GroupONE LIBRARYONE SOURCE
The same current text applies to every brand and every product. There are no versions that drift apart between websites.
Always the current versionRead the document in your browser or download it as a PDF to keep for your own records.
To read and to keepMIVARE GROUP PROSTA SPÓŁKA AKCYJNA · Registered office: 22-440 Krasnobród · Registry court: Sąd Rejonowy Lublin-Wschód w Lublinie z siedzibą w Świdniku, VI Wydział Gospodarczy KRS · KRS 0001268091 · NIP 9223092251 · REGON 545767254 · Share capital: PLN 1,000. The brands are trading names of a single entity.
You know who you are contracting withMivare Space
We use the files the site needs to work. Google Analytics, which shows us which pages are useful, runs only after you agree to it. Without consent, no data is sent to Google.
Necessary
Technical files the site needs to work properly and to remember your choice.
You will find the details in our Privacy policy and Cookie policy. You can change your choice at any time from the site footer.