Skip to content
MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Stock rotation. Mivare Space Help Centre
AREA 08 · REPORTS · TOPIC 06

Stock rotation

How your stock works: what it is worth, how many days each material will last and what moves fastest. A separate tab shows dead stock, the materials that did not go to a single job in the chosen period.

IN THE APP
Modules › Reports › Stock rotation
TABS
Rotation and dead stock
MODULE
Warehouse and logistics
CONNECTIONS
6 modules

01What it is

The report compares today's stock with consumption on jobs in the chosen date range. Stock is a snapshot as of today and the range does not change it; consumption only covers the chosen period.

Days of stock is the stock divided by the average daily consumption. Dead stock is an active material that has stock but did not go to a single job in the chosen range. A longer range therefore gives less dead stock.

People with the finance permission see values in money, everyone else sees item counts. The report is an extended mode item and belongs to the Warehouse and logistics module; without the module the data stays visible.

DAYS OF STOCK
How long the stock lasts at the current rate of consumption.
DEAD STOCK
Cash frozen in materials that do not move.
BELOW MINIMUM
Items whose stock has fallen to the minimum.

02What it is for

What must never run out

The ten materials that move fastest.

Frozen money

The value of materials sitting still.

Shortages in time

Items below minimum in a tile of their own.

Where the value sits

Stock value by item group.

03Main options

The report has tiles with stock value and levels, and two tabs: Rotation and Dead stock.

What moves and how fast

Tiles: stock value, dead stock, below minimum and consumption in period.

  • Fastest moving and stock value by group
  • Table: product, stock with the minimum flag, stock value, consumption in period, days of stock
  • Warehouse filter when the company has more than one location
Rotation

04Tasks step by step

  1. STEP 1Open Modules › Reports › Stock rotation, Dead stock tab.
  2. STEP 2Set the range to 12 months to see the materials that really stand still.
  3. STEP 3Decide what to use on the next jobs and what not to order again.

05Actions

The most common tasks in the rotation report.

Date range

The consumption window, compared with the previous period.

Warehouse

One location or all.

Export CSV

Rotation and dead stock.

06What it connects to

Choose a module to see where the data comes from.

MATERIALS

Stock levels

Stock and the warehouse minimum come from stock levels.

Go to the topicStock levels