Skip to content
MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Quotes. Mivare Space Help Centre
AREA 03 · SALES · TOPIC 02

Quotes

A quote is an offer for the customer before a job exists: scope of work, materials, labour and price. The customer accepts or rejects it, and from an accepted quote you create a job in a project unit in one step.

IN THE APP
Modules › Sales › Quotes
CONTAINS
Items and labour
NEXT
Create job
CONNECTIONS
5 modules

01What it is

A quote has a name, a customer, a preparation date, a valid-until date and a planned completion time in working days. A description of what is to be done is required. You add material items and labour after saving, on the quote card.

A quote moves through statuses: Draft, Sent, Accepted or Rejected, Expired and Converted to job. When the customer accepts the quote through an approval link, its status changes by itself.

A quote reserves nothing, neither people nor materials from the store. Only a job created from the quote does that.

ITEMS
Materials, services and labour with a customer price.
MARGIN
Estimated cost and planned margin with the finance permission.
HOURS
Base, specialist and expert labour hours.

02What it is for

A price with margin

Quote value, estimated cost and margin on one card.

How long it takes

Planned completion time and labour hours in the quote.

An offer for the customer

A customer printout with the notes visible to them.

No retyping

Items, labour and prices carry across to the job.

03Main options

The quotes screen is a register with tiles, the quote form and the quote card with its items.

All quotes and their state

Tiles: all quotes, drafts, with the customer, turned into jobs.

  • Filters for status, category and group
  • Columns: quote, customer, value, validity, status
  • Export CSV
Register

04Tasks step by step

  1. STEP 1Open Modules › Sales › Quotes and choose New quote.
  2. STEP 2Enter a name, for example “Flat on Elm Street: bathroom, kitchen and painting”, choose the customer and the valid-until date.
  3. STEP 3Describe what is to be done and save.
  4. STEP 4On the quote card add items in the Items tab and work in the Labour tab.

05Actions

The most common tasks around quotes.

New quote

A preliminary calculation before a job.

Add item

A material or service with a price.

Print for customer

An offer to hand to the customer.

Create job

A job with the quote's items.

Export CSV

Quotes in one file.

06What it connects to

Choose a module to see where a quote comes from and where it leads.

SALES

Enquiries

A quote can be created from an enquiry in one click.

Go to the topicEnquiries