Skip to content
MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Checklist templates. Mivare Space Help Centre
AREA 10 · SETTINGS · TOPIC 13

Checklist templates

Ready lists of points to tick off in a task: one for each type of work, or one for everything. On the task card you load a template and its points are added to that task's list. That way a bathroom before tiling and a room before handover are always checked the same way.

IN THE APP
Settings › Checklist templates
USED IN
The task checklist
POINT
Up to 180 characters
CONNECTIONS
4 modules

01What it is

A checklist template is a named list of points to tick off, assigned to a type of work or to any. Active templates are offered on the task card, in the Load from template field.

Loading adds the template points to the task checklist as required and skips those already on it. Changing or deleting a template later does not change lists that already exist.

A new company starts with two templates: Room handover and Bathroom before tiling. You can edit them or delete them.

COMPANY STANDARD
The same check whoever runs the task.
BY TYPE OF WORK
One list before tiling, another before a room handover.
A COPY IN THE TASK
Changing a template does not change old lists.

02What it is for

Fewer callbacks

A fixed list of points before the client sees the room.

A new person knows what to check

The template teaches the company standard without explaining it to everyone again.

A record of the check

Ticked points stay on the task.

03Main options

Templates are a list and the template form.

Templates and their status

Name with description, type of work, number of points and status: active or disabled.

  • Tiles: number of templates and of active ones
  • Edit, disable or enable, delete
  • A deleted template stays as a copy in the deleted records log
Template list

04Tasks step by step

  1. STEP 1Open Settings › Checklist templates and click New template.
  2. STEP 2Enter a name, choose the type of work, for example tiling and waterproofing, and type the points, each on its own line.
  3. STEP 3Save. The template is then offered on task cards.

05Actions

The most common tasks around templates.

New template

A new list of points to tick off in a task.

Disable

The template leaves the choice on the task card.

Load from template

Points added to the task checklist.

06What it connects to

Choose a module to see where checklists are used.

PROJECTS

Tasks

The task card loads points from active templates into its checklist.

Go to the topicTasks