Skip to content
MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Session and security. Mivare Space Help Centre
AREA 10 · SETTINGS · TOPIC 14

Session and security

Two decisions for the whole company: after how much inactivity the application signs you out, and whether every account must sign in with a second factor. The second factor is a code from an app on the phone, so client and project data stay protected even after a password leak.

IN THE APP
Settings › Session and security
SESSION
30 minutes or 45–240
SECOND FACTOR
A code from a phone app
CONNECTIONS
3 modules

01What it is

Session time is the inactivity while signed in after which you are signed out. In automatic mode it is 30 minutes, and you can set your own time from 45 to 240 minutes in 15-minute steps. Regardless of this, a session lasts at most 12 hours from sign-in, after which you need to sign in again.

The second sign-in factor is a code from an app on the phone, with no SMS and no email. When the company owner turns on the requirement for all accounts, anyone without a second factor gets past the password only to the setup screen. Whoever already has a code keeps it even when the requirement is off.

There are no backup codes, so turning on the requirement needs a second person with the Configuration: edit permission, who can remove the second factor on the Users screen if a phone is lost.

AUTOMATIC SIGN-OUT
30 minutes or your own time up to 4 hours.
A CODE FROM THE PHONE
No SMS and no email.
THE OWNER DECIDES
Only the company owner turns on the requirement for all accounts.

02What it is for

A password is not enough

The second factor protects client data, quotes and floor plans even after a password leak.

The computer in the design office

A short session signs out a workstation someone has walked away from.

Trusted browser

A browser confirmed once does not ask for a code for 30 days.

03Main options

The screen has two parts: session time and the second sign-in factor.

When to sign out

The inactivity time for every account in the company.

  • Automatic mode: 30 minutes
  • Own time: from 45 to 240 minutes in 15-minute steps
Session time

04Tasks step by step

  1. STEP 1Make sure a second person has the Configuration: edit permission.
  2. STEP 2As the company owner open Settings › Session and security and tick Require a second factor on every account in the company.
  3. STEP 3Click Save the sign-in rule. Anyone without a second factor sets it up at their next sign-in.

05Actions

The most common security tasks.

Session time

Automatic sign-out after inactivity.

Require a second factor

A phone code for every account in the company.

Remove a second factor

Help with a lost phone, on the Users screen.

06What it connects to

Choose a module to see the related account settings.

YOUR ACCOUNT

My account

You turn on a second factor for your own account in My account.

Go to the topicMy account