Skip to content
MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Equipment inspections. Mivare Space Help Centre
AREA 06 · SUBCONTRACTORS AND EQUIPMENT · TOPIC 06

Equipment inspections

Inspection and maintenance plans for company equipment with due dates: a lifting platform inspection, a meter calibration, a filter change. A completed record stores the date, the performer, the report number and a PDF, and the next due date is worked out for you.

IN THE APP
Modules › Subcontractors and equipment › Equipment inspections
REMINDER
7 days before the due date
RECORD
With a PDF report
CONNECTIONS
4 modules

01What it is

An inspection plan is a recurring task for one asset: the inspection type, the frequency in days and the next due date. The asset can be a tool or equipment from the register, or gear entered by name only. The menu item is visible in extended mode.

A completed record stores the date, the performer, the report number, the cost and a PDF document. After a record the next due date is worked out for you: the date last done plus the frequency.

A plan with records is part of the register and cannot be deleted. When the equipment goes out of use, untick Plan active.

THE DATE WORKS ITSELF OUT
Last done plus the frequency.
A DOCUMENT WITH THE RECORD
A report or certificate in PDF.
DISABLE, DO NOT DELETE
A plan with history stays in the register.

02What it is for

Nothing slips

A notification when an active plan is 7 days from its due date or past it.

Documents for checks

Inspection reports and calibration certificates in one register.

Start of the day

Tiles: overdue and within 14 days.

Cost of inspections

People with finance access see the cost of a record.

03Main options

The screen has two tabs, Plans and Completed, and the plan and completed record windows.

Asset, type, last done and next due

Tiles: inspection plans, overdue and within 14 days.

  • The next due date in red once it has passed; “plan disabled” on an inactive one
  • Store filter by the tool's location
  • Row menu: Mark as done, Edit, Delete inspection plan without records
Plans

04Tasks step by step

  1. STEP 1Open Modules › Subcontractors and equipment › Equipment inspections and choose New inspection plan.
  2. STEP 2Choose a tool from the register or Not applicable, and enter the asset name.
  3. STEP 3Enter the inspection type, frequency in days and next due date. Save.

05Actions

The most common tasks with equipment inspections.

New inspection plan

A recurring inspection of a tool or piece of equipment.

Mark as done

A record with a date, performer and PDF.

Open document

The report from a completed record.

Overdue

Plans whose due date has passed.

06What it connects to

Choose a module to see which equipment the inspections cover.

SUBCONTRACTORS AND EQUIPMENT

Tools

A tool's plans are shown on its card in the Inspections and service tab.

Go to the topicTools