Skip to content
MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Tools. Mivare Space Help Centre
AREA 06 · SUBCONTRACTORS AND EQUIPMENT · TOPIC 05

Tools

A register of company tools: power tools, hand tools, measuring equipment. Each has a location and a card showing which project it was on, who took it, when it is due for inspection and in which jobs its use was billed.

IN THE APP
Modules › Subcontractors and equipment › Tools
CARD
A tool with its history
MODULE
Warehouse and logistics
CONNECTIONS
6 modules

01What it is

Tools is the register of hand, power and measuring equipment with a location, make and model, purchase date, value and depreciation period. The menu item is visible in extended mode.

You can bill the use of a tool to the client: in a quote you pick it from the catalogue as an item marked [N], named “Use” and priced at the price in the job. The tool card collects billing from jobs in the In works tab.

You issue a tool to a project and take it back just like equipment. A tool can be issued to only one project at a time.

TOOL CARD
Location, inspections, projects and billing.
USE IN A QUOTE
An [N] item with the price in the job.
ONE ISSUE AT A TIME
An issued tool has to be taken back first.

02What it is for

No searching the bases

A location on every tool and a project on an issued one.

Inspection on time

Inspection plans with a date on the tool card.

The tool earns

Use billed in jobs with its value.

Who has the tool

An issue records who took it and when.

03Main options

The screen has the tool list, the tool window and the tool card.

Tool, location, category and price

A list in a table or in tiles with a photo.

  • Columns: tool with make, location, category, purchase value (with finance access), in the job
  • Filters: store, category and group; search by name and brand
  • Row menu: Tool card, Edit, Remove from catalogue
Tool list

04Tasks step by step

  1. STEP 1Open Modules › Subcontractors and equipment › Tools and choose Add tool.
  2. STEP 2Enter the name, make and model, and set the location and category.
  3. STEP 3Enter the price in the job if you bill its use to the client. Save.

05Actions

The most common tasks with tools.

Add tool

A new item in the register.

Issue equipment to a project

An issue with a date and a person.

Inspections and service

Inspection and calibration plans.

Tool card

History of projects and billing.

06What it connects to

Choose a module to see where the tools work.

SUBCONTRACTORS AND EQUIPMENT

Equipment inspections

Inspection and calibration plans for tools.

Go to the topicEquipment inspections