MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
My account. Mivare Space Help Centre
AREA 11 · YOUR ACCOUNT · TOPIC 02

My account

The security of your sign-in: the password, the email address you sign in with and two-factor authentication. Before you see these settings you confirm with your password that it is you, even when you are already signed in.

IN THE APP
Account menu › My account
CONFIRMATION
Password, valid for 15 minutes
SECOND FACTOR
A code from a phone app
CONNECTIONS
3 modules

01What it is

My account holds your sign-in settings. Opening it requires your password, and the confirmation is valid for 15 minutes. Lock now closes the access earlier.

Changing the password or the sign-in email ends your sessions on other devices and removes trusted devices. You receive an email about a password change.

Two-factor authentication is a code from an app on your phone, for example Google Authenticator, Microsoft Authenticator, Authy, 1Password or Bitwarden.

PASSWORD FIRST
Confirmation before any change, valid for 15 minutes.
STRONG PASSWORD
At least 10 characters, no common passwords.
CODE FROM THE PHONE
The second factor in an authenticator app.

02What it is for

Your account only

The second factor protects the account even after a password leak.

Lost laptop

Changing the password signs out every other device.

New email address

You move your sign-in and the password reset link to a new address without an administrator.

03Main options

After confirming with your password you see the Password, Sign-in email and Two-factor authentication tabs.

New password

You enter the new password twice.

  • At least 10 characters
  • No common passwords and no words from the sign-in or company name
  • The change ends other sessions and removes trusted devices
Password

04Tasks step by step

  1. STEP 1Click the avatar, choose My account and confirm with your current password.
  2. STEP 2On the Password tab, enter the new password twice (at least 10 characters) and save.
  3. STEP 3Other devices are signed out.

05Actions

The most common tasks on your account.

Change password

A new password and other devices signed out.

Change email

A new sign-in address.

Enable 2FA

A code from a phone app.

Lock now

End the confirmed access.

06What it connects to

Choose a module to see the related settings.

SETTINGS

Session and security

The company can require a second factor on every account.

Go to the topicSession and security