MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Surplus. Mivare Space Help Centre
AREA 05 · MATERIALS · TOPIC 07

Surplus

The screen answers one question: is it already somewhere. Before you buy adhesive or tiles for one project, check whether some were left on another, and prepare a transfer instead of an order.

IN THE APP
Modules › Materials › Surplus
REQUIRES
Extended mode
SURPLUS
Stock minus reservations and minimum
CONNECTIONS
5 modules

01What it is

The screen shows requirement items with the status Needed, together with the project they are for, and checks whether the same material sits in another store.

Surplus is stock minus reservations minus minimum stock. Taking material below the minimum stock would take it from another project, so it is not offered.

The app does not move material by itself. It prepares a draft transfer to the project base store, and a person confirms the physical move when settling it.

QUESTION
Is it already somewhere.
RESULT
A draft stock transfer.
CONDITION
The project must have a base set.

02What it is for

Do not buy twice

Material from another store instead of a new order.

Clear the shelves

Leftovers from finished work go where they are needed.

Do not take from others

Reservations and minimum stock do not count as surplus.

Know what is left to buy

The Left to buy tile after deducting what can be covered.

03Main options

Surplus is the list of items to cover, the breakdown of each surplus and preparing a transfer.

Needs and what is already in stock

Tiles: Items to cover, Available from stock, Transfers prepared and Left to buy.

  • Columns: material, for what, needed, sitting as surplus, transfer
  • Filter: all requirements or only those that can be covered
  • Search by material, project and requirement number
Items to cover

04Tasks step by step

  1. STEP 1Open Modules › Materials › Surplus.
  2. STEP 2Set the filter to Only those that can be covered.
  3. STEP 3On the item choose Prepare a transfer.
  4. STEP 4In Stock documents settle the transfer once the material has been moved.

05Actions

The most common tasks on the surplus screen.

Prepare a transfer

A draft transfer to the project base.

Coverable only

Items with surplus available.

Requirements

The full list of needs.

Stock documents

Settling the transfer.

06What it connects to

Choose a module to see where the items come from and where the transfer goes.

MATERIALS

Requirements

The screen shows requirement items with the status Needed.

Go to the topicRequirements