MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Stock documents. Mivare Space Help Centre
AREA 05 · MATERIALS · TOPIC 06

Stock documents

Goods issues when material leaves for a customer, and transfers when it changes store, for example from the base to another project. A document is a draft you can edit, and stock changes only when it is settled.

IN THE APP
Modules › Materials › Stock documents
REQUIRES
Extended mode
STOCK CHANGES
Only on settlement
CONNECTIONS
5 modules

01What it is

A goods issue takes material off stock when it leaves for a recipient: a customer from the files or someone outside them. A transfer takes material off the source store and adds it to the target store.

A document starts as a draft. Until it is settled you edit the items and details without touching stock. A draft can be deleted.

A settled document changes the stores' stock and can no longer be edited or deleted. A free-text item, with no product from stock, does not change stock.

GOODS ISSUE
Material leaves for a recipient.
TRANSFER
Material changes store.
SETTLEMENT
The only point where stock changes.

02What it is for

Move material

A transfer from the base to a project or between stores.

Issue to a customer

A goods issue with a recipient and unit price.

Edit without risk

A draft does not touch stock, so you can change items freely.

Know the value

The Value settled tile from the item unit prices.

03Main options

Documents are two tabs, goods issues and transfers, and the document record with its items and settlement.

Two tabs of documents

Tiles: goods issues or transfers in total, Drafts, Settled and Value settled.

  • Columns: document, recipient or target warehouse, date, items, value, status
  • Search by number and recipient, warehouse filter
  • Row menu: record, edit, settle and delete a draft
Issues and transfers

04Tasks step by step

  1. STEP 1Open Modules › Materials › Stock documents, the Transfers tab.
  2. STEP 2Choose New transfer, pick the source and target warehouses and save.
  3. STEP 3On the document record add items from stock with quantities.
  4. STEP 4Once the material has physically moved, choose Transfer the goods.

05Actions

The most common tasks around stock documents.

New goods issue

Material leaves for a recipient.

New transfer

Material changes store.

Add an item

A product from stock or free text.

Issue or transfer the goods

Settlement changes stock.

Delete a draft

Stores' stock stays unchanged.

06What it connects to

Choose a module to see what a settled document changes.

MATERIALS

Stock levels

Settlement records sale or transfer movements in stock.

Go to the topicStock levels