MIVARE LABS SPACE RENOVATION AND INTERIOR FIT-OUT MANAGEMENT SYSTEM
Stock levels. Mivare Space Help Centre
AREA 05 · MATERIALS · TOPIC 05

Stock levels

The stock of every material in every company store: how much is on the shelf, how much is reserved for jobs and how much is left to use. You set a minimum, and when the available quantity drops to it, the app sends a notification.

IN THE APP
Modules › Materials › Stock levels
AVAILABLE
Stock minus reservations
KEPT
Separately in every location
CONNECTIONS
6 modules

01What it is

Stock levels shows every active material in every location: physical stock, minimum, storage location and available quantity.

Available is physical stock minus job reservations in the same location. A material is below minimum when it has a minimum set and the available quantity is equal to it or lower.

Every stock change stays in the product's movement history: opening balance, purchase, adjustment, used on job, returned from job, sale and transfer.

BY LOCATION
Stock, minimum and storage location separately in every store.
HONEST AVAILABLE
Job reservations deducted from physical stock.
MOVEMENT HISTORY
Every stock change with its movement type and note.

02What it is for

Order in time

A Low stock level notification when the available quantity drops to the minimum.

Know where it is

A storage location with every stock entry, in every location.

No double use

Material reserved for one job is not available to another.

Stock value

People with access to finance see the stock value at purchase cost.

03Main options

The stock screen is a list with tiles, the stock correction window and the product record with its movement history.

Material, location, stock and available

Tiles: Stock items, Below minimum, and Stock value (with access to finance) or Reserved.

  • Columns: product, category, location with storage location, physical stock with minimum, available, price in the job
  • Filters: warehouse, category and group, whole warehouse or below minimum only
  • Search by name, brand and variant, CSV export
Stock list

04Tasks step by step

  1. STEP 1Open Modules › Materials › Stock levels and add the product if it is not there yet. The product form does not change stock.
  2. STEP 2On the product choose Correct stock, pick the location and enter the quantity.
  3. STEP 3The first entry in a location is saved as the opening balance.

05Actions

The most common tasks around stock.

Add a product

A new item in the stock catalogue.

Correct stock

Stock, minimum and storage location in a location.

Product record

Stock by location, movements and use.

Below minimum

Materials to reorder.

CSV export

Stock from the current filter in one file.

06What it connects to

Choose a module to see how it changes or uses stock.

MATERIALS

Material reservations

Job reservations lower the available quantity, not physical stock.

Go to the topicMaterial reservations