01What it is
A location is a place the company works from: a base, a warehouse, an office or a storage yard. One location is the default.
A location is not a filter for the whole application. It concerns stock, equipment, the team and project bases: every employee has a base, and every project has a base and store from which material is reserved and issued.
A location used by employees, projects, equipment or stock cannot be deleted. That safeguard protects your stock levels.
- FOUR TYPES
- Base, warehouse, office and storage yard.
- STOCK APART
- The same goods can sit in two places.
- ONE DEFAULT
- The default location goes into new projects.
02What it is for
Stock in every place
Inventory counts goods separately in each location, and stock screens have a warehouse filter.
Project base
A project takes material from its base's warehouse.
Who works from where
Every employee has a base they set out from.
Equipment on site
Tools and equipment are assigned to a location.
03Main options
Locations are a list, the location form and the location card.
Every place of the company
Name with the default marked, type, address, contact and status.
- Tiles: all locations and active ones
- Add a location
- Card, edit and delete from the row menu

Type, address and contact
Name and country are required.
- Type: base, warehouse, office or storage yard
- Address, postcode, town, phone and email
- Warehouse code, contact person, opening hours and notes
- Location active and default location

What belongs to this place
Overview, Team, Projects and Stock tabs.
- Location details: address, contact and hours
- The team with this location as their default
- Projects based in this location
- Goods in stock and the stock value

04Tasks step by step
- STEP 1Open Settings › Locations and choose Add a location.
- STEP 2Enter the name, choose the Warehouse or Storage yard type and the country.
- STEP 3Fill in the address, warehouse code and contact person, then save.
- STEP 1Open the location for editing.
- STEP 2Tick Default location and save. There can be only one default, so the previous one stops being it.
- STEP 1If employees, projects, equipment or stock use it, move them to another location first.
- STEP 2You can also untick Location active so it is no longer used.
05Actions
The most common tasks around locations.
Add a location
A new base, warehouse, office or yard.
Default location
One location to start new projects from.
Location card
Team, projects and stock in one place.
06What it connects to
Choose a module to see what belongs to a location.
Projects
Every project has a base and store chosen from the locations.
Go to the topicProjectsTools
Tools and equipment are assigned to a location.
Go to the topicToolsStock documents
Stock documents name a location, and a transfer also the target location.
Go to the topicStock documents